Testing & commissioning (FAT/SAT)
Proof that every system performs as designed — documented, witnessed and signed off before handover.
Serving all of Qatar
Project Delivery · Commissioning
Proof that every system performs as designed — documented, witnessed and signed off before handover.
We prepare test procedures for approval, then test cabling, devices and complete systems: channel certification and fiber loss tests, camera image quality and frame rates, recording and retention, access and alarm scenarios, failover and UPS cut-over. Results are recorded on test sheets and witnessed with the consultant, and handover includes O&M manuals, as-built drawings and training.
| Test equipment | Calibrated copper certifiers, OTDRs and power meters |
|---|---|
| Test types | FAT, SAT, channel certification, failover and endurance |
| Records | Device test sheets and serial number registers |
| Handover | O&M manuals, as-built drawings and training |
Testing in line with Qatar Construction Specifications (QCS), ANSI/TIA cabling test standards and applicable MOI-SSD test requirements.
Integration and failure scenarios are tested, not just individual devices.
Certification results are only as good as the test equipment's calibration.
Joint witnessing with the consultant speeds up acceptance.
Factory acceptance testing checks equipment before delivery; site acceptance testing proves the installed system works on site.
Yes. We can carry out independent testing and report the results.
Tell us about the site, the programme and the systems involved — we will propose a Commissioning scope, a team and a realistic timeline.