Testing & commissioning (FAT/SAT)

Proof that every system performs as designed — documented, witnessed and signed off before handover.

Certifying a network cable link with a cable tester

What Commissioning covers

We prepare test procedures for approval, then test cabling, devices and complete systems: channel certification and fiber loss tests, camera image quality and frame rates, recording and retention, access and alarm scenarios, failover and UPS cut-over. Results are recorded on test sheets and witnessed with the consultant, and handover includes O&M manuals, as-built drawings and training.

Commissioning in brief

Test equipmentCalibrated copper certifiers, OTDRs and power meters
Test typesFAT, SAT, channel certification, failover and endurance
RecordsDevice test sheets and serial number registers
HandoverO&M manuals, as-built drawings and training

Testing in line with Qatar Construction Specifications (QCS), ANSI/TIA cabling test standards and applicable MOI-SSD test requirements.

Commissioning engineer certifying links and testing camera failover

Commissioning deliverables

When clients ask for Commissioning

How we approach Commissioning

Test the whole system

Integration and failure scenarios are tested, not just individual devices.

Calibrated instruments

Certification results are only as good as the test equipment's calibration.

Witnessed results

Joint witnessing with the consultant speeds up acceptance.

Commissioning: common questions

Factory acceptance testing checks equipment before delivery; site acceptance testing proves the installed system works on site.

Yes. We can carry out independent testing and report the results.

Need Commissioning on your next project?

Tell us about the site, the programme and the systems involved — we will propose a Commissioning scope, a team and a realistic timeline.